Home
World Journal of Advanced Engineering Technology and Sciences
International, Peer reviewed, Referred, Open access | ISSN Approved Journal

Main navigation

  • Home
    • Journal Information
    • Abstracting and Indexing
    • Editorial Board Members
    • Reviewer Panel
    • Journal Policies
    • WJAETS CrossMark Policy
    • Publication Ethics
    • Instructions for Authors
    • Article processing fee
    • Track Manuscript Status
    • Get Publication Certificate
    • Issue in Progress
    • Current Issue
    • Past Issues
    • Become a Reviewer panel member
    • Join as Editorial Board Member
  • Contact us
  • Downloads

ISSN: 2582-8266 (Online)  || UGC Compliant Journal || Google Indexed || Impact Factor: 9.48 || Crossref DOI

Fast Publication within 2 days || Low Article Processing charges || Peer reviewed and Referred Journal

Research and review articles are invited for publication in Volume 20, Issue 3 (September 2026).... Submit articles

WASTE MINIMIZATION AS A STRATEGIC OPTION FOR PROFIT MAXIMIZATION ON CONSTRUCTION SITES IN ENUGU STATE, NIGERIA

Breadcrumb

  • Home
  • WASTE MINIMIZATION AS A STRATEGIC OPTION FOR PROFIT MAXIMIZATION ON CONSTRUCTION SITES IN ENUGU STATE, NIGERIA

Anthony Nnamdi Ezemerihe 1, *, Nnamdi Samuel Anya 2 and Shedrack A. Ume 3 

1 Department of Civil Engineering, Faculty of Engineering, Enugu State University of Science and Technology (ESUT), Enugu, Nigeria.
2 Department of Building, Faculty of Environmental Sciences, Enugu State University of Science and Technology, Enugu.
3 Everwinners Construction Company Nigeria Limited Enugu, Nigeria.
* Corresponding Author: Anthony Nnamdi Ezemerihe. Email: ecatonia2008@yahoo.com
ORCID Details
Anthony Nnamdi Ezemerihe: https://orcid.org/0009-0007-2081-9266 

Research Article

 

World Journal of Advanced Engineering Technology and Sciences, 2026, 20(02), 192–208

Article DOI: 10.30574/wjaets.2026.20.2.0410

DOI url: https://doi.org/10.30574/wjaets.2026.20.2.0410

Received on 04 July 2026; revised on 16 August 2026; accepted on 18 August 2026

This study assessed material wastage on construction sites in Enugu urban, Enugu State, Nigeria, with a view to proposing methods for waste minimization. Specific objectives were to identify sources of material waste, examine critical construction stages and their associated wastage levels, determine factors contributing to material waste, evaluate the impact of material waste on building project delivery, and propose waste minimization methods. A mixed research design combining descriptive survey and ex post facto approaches was adopted. Given a small and manageable target population of 36 building professionals (architects, builders, engineers, quantity surveyors, and urban planners) in Enugu urban, the entire population was surveyed by census, and all 36 questionnaires administered were retrieved, a 100% response rate. Data were analysed using mean item scores, one-sample t-tests, and regression and correlation analysis of secondary bill-of-quantities data. Results show that cut-off waste, stockpile waste, and application waste are the leading sources of material waste, while the construction stage carries the highest associated wastage among the six project stages examined. Material storage, fabrication, and procurement practices were identified as the strongest contributing factors, and developing logistics strategies, training and educating workers, and checking materials on arrival were rated the most effective minimization methods. Regression analysis of historical project data found a weak, statistically non-significant negative relationship between material wastage and building delivery performance (r = −0.161, R² = 0.026, p = .599), whereas professionals' perception-based assessment indicated a significant impact. The study recommends an integrated waste-management framework anchored on improved material storage, procurement control, and site supervision to enhance building project delivery in Enugu urban.

Material Wastage; Construction Waste; Construction Project Delivery; Waste Minimization; Enugu Urban; Mean Item Score

https://wjaets.com/sites/default/files/fulltext_pdf/WJAETS-2026-0410.pdf

Get Your e Certificate of Publication using below link

Download Certificate

Preview Article PDF

Anthony Nnamdi Ezemerihe, Nnamdi Samuel Anya and Shedrack A. Ume. WASTE MINIMIZATION AS A STRATEGIC OPTION FOR PROFIT MAXIMIZATION ON CONSTRUCTION SITES IN ENUGU STATE, NIGERIA. World Journal of Advanced Engineering Technology and Sciences, 2026, 20(02), 192–208. Article DOI: https://doi.org/10.30574/wjaets.2026.20.2.0410

Get Certificates

Get Publication Certificate

Download LoA

Check Corssref DOI details

Issue details

Issue Cover Page

Editorial Board

Table of content


Copyright © Author(s). All rights reserved. This article is published under the terms of the Creative Commons Attribution 4.0 International License (CC BY 4.0), which permits use, sharing, adaptation, distribution, and reproduction in any medium or format, as long as appropriate credit is given to the original author(s) and source, a link to the license is provided, and any changes made are indicated.


Copyright © 2026 World Journal of Advanced Engineering Technology and Sciences

Developed & Designed by VS Infosolution